Captive Shot Blasting Concrete Bridge Decks
Preparation For Re-Waterproofing
One of our main areas of work is the removal of failed waterproofing membrane residue.
This is done by captive shot blasting of the bridge deck using the latest Blastrac 2-20 DT following on after road planing by others. Shot blasting enables us to prepare large areas very quickly – vitally important with weather dependent operations such as re-waterproofing.
Dust and other debris are eliminated effectively, without atmospheric pollution and inconvenience to our clients’ workforce or to the public.